MACKEY > Projects

Sample of projects previously undertaken by Mackey:

Daly’s Bridge, Cork. Client – Cork City Council

Repair, rehabilitation and reinstallation of single span heritage bridge including dismantling and removal offsite.

Meelick Weir, Galway. Client – Waterways Ireland

Design, fabrication and installation of a 300 meter elevated steel walkway over the River Shannon at Meelick Weir connecting Galway to Offaly.

Ennis Train Station. Client – Ward & Burke Construction

Fabrication and installation of Steel Canopy and Footbridge

North Bull Lighthouse, Dublin Port. Client – Dublin Port

Fabrication and Installation of external steelwork including Access Platforms, Walkway and Curved Stairs

Royal Canal Premium Cycle route. Client – Jons Civil Engineering

Fabrication and installation of bespoke handrails along both sides of the Viaduct Bridge making a smooth transition into the existing Newcomen Bridge.

Portumna Bridge, Galway

Restoration and re-strengthening of existing Bridge structure including blasting and re-application of coating.

Clontarf Bridge, Cork

Restoration and re-strengthening of existing Bridge structure including blasting and re-application of coatings.

St. Francis Pedestrian Bridge Kilkenny

Complex Fabrication and Erection including all Architectural Finishes.

Dublin Port CORT-10 Steel Bridge

Fabrication of complex Corton Steel Bridge including all Architectural Stainless Features.

Navan Foot Bridge

Cambered Cantilevered Structure with all architectural finishes including hardwood and complex fabrication and erection.

Tyrconnell Road Bridge

Replication of 123 years old railway bridge in Donegal Town with complete fabrication and correction and architectural finishing including installation of Bridge Bearings and Services.

Dublin Port Facilities

Supply and Installation of 24m Aluminium Gangways including 4 No. 20m Floating Pontoons.

Birr Foot Bridge

Supply and Installation of Foot Bridge including Fabrication and Installation.

UL Foot Bridges

Supply and Installation of 3 Foot Bridges including Fabrication and Installation.

Dublin Port Cruise Ship Access

Supply and Installation of Raised Landing Platform including Gang Planks.

Limerick Boardwalk

Supply and installation of large overhang Platform including fabrication and installation.

Templemore Fire Station

Supply and Installation of Training Tower

Cliffs of Moher

Supply and installation of cladding on Visitor Centre.

Ashton Comprehensive School Cork

Structural steel and cladding for construction of school.